Appalachian Pipeline Contractors
A graded pipeline right-of-way running cross-country
Wilson County, I-40 east

Pipeline Contractor in Lebanon, TN

Lebanon and Wilson County are just across the Cumberland from our yard, about half an hour down Highway 109. The I-40 corridor east of Nashville has filled up with distribution centers and plants, and all of it runs on gas.

Request a Bid

Headquarters

901 Long Hollow Pike, Gallatin, TN 37066

From the yard

About 25 miles, half an hour from Gallatin.

Crews

Union, self-performed, signatory to four crafts

Glade rock and the south bank of the Cumberland

Wilson County is Central Basin limestone, and a good part of it is cedar glade country: thin soil over flat rock, where a route that looks like easy digging from the road turns into rock trenching a foot down. The Cedars of Lebanon area is the classic example, and the same conditions show up across the county.

North of town the ground rolls down to the Cumberland River and Old Hickory Lake, with Spring Creek, Cedar Creek, and Barton Creek cutting across the county. South and east it rises toward the Highland Rim, with more grade and more spring-fed streams.

I-40, Highway 109, and the river between us

Interstate 40 runs the length of Wilson County from Mt. Juliet through Lebanon, with US 231, US 70, and State Route 109 feeding it. Interstate and state route crossings are TDOT bores; the cities and Wilson County handle local roads. The industrial parks along I-40 sit close to the interstate, so a short line to a site often carries an interstate bore in it.

The Cumberland River and Old Hickory Lake form the county's northern edge, and a line coming from Gallatin crosses them, by HDD, permitted through TDEC and the Corps of Engineers. The county's creeks each need a TDEC permit. The Nashville and Eastern short line runs through Lebanon, and railroad crossings carry their own agreement and flagging.

Crossings are usually where a pipeline schedule is won or lost, which is why a pipeline contractor working in Lebanon should have the permits moving the day the route is set. Our post on how pipelines cross roads and railroads walks through the methods, and horizontal directional drilling is the tool for the river and highway crossings that cannot be open-cut.

Gas for the distribution corridor

Distribution centers and manufacturing along I-40 are the main gas load in Wilson County, and the residential growth in Mt. Juliet and Lebanon adds distribution work behind it. Typical scopes are a tie-in to existing transmission, new pipe along or across the interstate corridor, and a meter station at the site.

Because Wilson County sits between our yard and the Nashville metro, it is about as home as a project gets without being in Sumner County. Crews, equipment, and an owner are on site the same morning, and the people who pull the permits here have been doing it for years.

About as close to home as a job gets

A Lebanon job runs from the yard with no mobilization to speak of. What sets the schedule is the interstate crossing permit, any Cumberland crossing, and long-lead materials, so those start the day the route is set.

Construction runs the standard sequence with rock in it: clear and grade, string, weld, coat, trench through limestone and glade rock, bore the roads and creeks, lower in, backfill, hydrotest, and restore. On an industrial park the restoration is often paving and hardscape, and the schedule has to fit around the site contractor, which is coordination we plan for.

Where the crews come from does not change how the job runs. Pipeline construction in Lebanon follows the same sequence we run everywhere, and capacity comes from spreads and crews sized to the route, and the same safety program and superintendents run every site. There is a longer walk-through of the whole sequence in how a pipeline project comes together.

Who we work with in Wilson County

In Wilson County we build for distribution and manufacturing developers along I-40, for the gas utilities and midstream operators serving Lebanon and Mt. Juliet, for power generation projects, and as the pipeline partner for EPC and design-build firms delivering industrial sites in the corridor.

If you are comparing pipeline contractors for a project in Lebanon, our guide to hiring a pipeline contractor covers the questions that matter in any state, and a privately owned contractor means the person who can say yes to your schedule is the one you are talking to.

Talk to the team

Tell us where the project is and what it needs. You get a straight answer on fit, schedule, and what is realistic.

Request a Bid

Questions

Lebanon FAQs.

Planning a pipeline in Lebanon?

Send us the location, the scope, and the timeline, even if it is still a route drawn on a map. We will tell you plainly whether we are the right call.

Request a Bid